Qwen Cloud Track 4 evidence hub

PrizePilot is submitted, public, and still improving before judging.

This hub gives judges and reviewers the fastest path through the public evidence: the submitted Devpost project, the short demo video, the presentation deck, the Blog Post Award story, benchmark method, Qwen live smoke proof, and a static judge demo that separates verified proof from remaining account-gated work.

3-link reviewer fast path

  1. Confirm the submitted identity on Devpost.
  2. Watch the public demo video, or use the backup WebM if Vimeo is unavailable.
  3. Read the Blog Award story for the product loop, Qwen role, and build narrative.

After those three actions, open the Judge Card and Official Requirement Fit map for deeper proof, award thesis, Qwen evidence, and do-not-infer boundary.

Judge Demo

Static review page with route ranking, evidence map, Qwen client shape, screenshots, and remaining proof gaps.

Backup WebM Demo

Pages-hosted silent video fallback for reviewers who cannot play the Vimeo page or embedded player.

Judge Evidence Pack

One-page judging matrix for Track 4 fit, Blog Post Award evidence, reproducibility, and account-gated proof boundaries.

Award Preflight

Fast readiness check for Blog Post Award and Honorable Mention judging, with live cloud proof gates separated from public claims.

Award Evidence Map

Compact signal matrix for Blog Post Award, Honorable Mention, public proof, reproducibility, and account-gated live proof.

Cloud Readiness

No-secret verifier for Qwen request shape, Alibaba Function Compute manifest, dashboard payload, and public claim boundary.

Benchmark Method

Inspectable scoring method for ranking cash-prize routes, including sample portfolio, signals, commands, and limits.

Live Proof Gate

Action-time checklist showing the completed Qwen/DashScope live proof and the remaining Alibaba Cloud endpoint gate.

Qwen Live Proof

Non-sensitive smoke-test evidence for the live Qwen/DashScope refinement path, including model, endpoint, exit code, and key cleanup.

Qwen Contribution Map

Shows how Qwen refined the route plan, story, risk wording, and evidence packaging without replacing deterministic scoring or proof gates.

Qwen Before/After Evidence

Shows the deterministic plan, Qwen refinement pass, and concrete public copy improvements that followed.

Judge Review Card

One-minute judge path with award thesis, Qwen evidence, and do-not-infer boundaries.

Official Requirement Fit

Maps Qwen Cloud requirements to public evidence, prepared code proof, and the one remaining Alibaba endpoint gate.

Award Thesis Scorecard

Ranked Blog Award, Honorable Mention, and Track 4 thesis with evidence links and no endpoint overclaim.

Blog Share Packet

Safe title, summary, link order, social copy, and do-not-say list for the Blog Post Award route.

Public Update Checklist

Pre-push and Devpost-edit gate for tests, public links, video checks, and claim boundaries.

Public Update Digest

Decision packet for the repository update: public baseline, prepared HEAD, proof improvements, and do-not-claim boundaries before any Devpost copy.

Final Judge One-Page

Compact reviewer path for submitted identity, Qwen evidence, Blog Award thesis, and the still-pending Alibaba endpoint boundary.

Alibaba Endpoint Checklist

Compact success criteria for the remaining public HTTP 200 endpoint proof at / and /api/plan.

Judge Manifest JSON

Machine-readable award targets, judge path, completed evidence, pending gates, and do-not-infer boundaries.

Static Plan JSON

Setup-free machine-readable snapshot of the same route ranking, scorecard, approval queue, and evidence gaps served by the local API.

Presentation Deck

Editable 5-slide PowerPoint summary covering the route, architecture, proof boundary, and next sponsor-evidence sprint.

Blog Award Story

Judge-readable article explaining the workflow, Track 4 fit, Qwen path, Alibaba deployment plan, and integrity boundary.

Devpost Project

Submitted Qwen hackathon page with public Story, Vimeo demo, repository link, and editable status before the deadline.

Repository

Source, tests, screenshots, route ledger, validation report, Qwen live proof, live-check runbook, and Alibaba Cloud manifest.

Evidence boundary: public repo, Devpost, Vimeo demo, backup WebM demo, presentation deck, Blog Award story, static plan snapshot, and live Qwen/DashScope refinement are verified. Newly added review links on this hub, including the Judge Review Card, Official Requirement Fit map, Award Thesis Scorecard, Blog Share Packet, Public Update Digest, Final Judge One-Page, Qwen before/after evidence, and judge manifest, should be HTTP 200 rechecked before they are copied into Devpost. Live Alibaba Cloud endpoint proof remains a prepared path, not a completed claim.